MTR East Rail Line Cross-Harbour Extension – Construction Challenges
A marvel of tunnel precast engineering
Eleven precast tunnel units were fabricated at the casting yard in the former Shek O Quarry. The casting yard was then filled with sea water for the units to be floated and towed to Tseung Kwan O for the installation of survey towers and floating pontoons.